Read more
A man on the roof of a modern house installing solar panels, while another man stands on the patio watching.

Installation

From roof to switched on

From the first survey to your system's first kilowatt-hour, we take care of the whole journey.

Typically 1–3 days
Authorised installers
Tested before handover

We don't just turn up with a stack of panels

We start by mapping your home, your roof and your consumption. Only when we see the whole picture do we design a solution that fits you – technically, aesthetically and financially.

DAY 01 – We start on the roof

The scaffolding goes up. The mounting system is fixed in place, and the panels find their spot on the roof.

Day 02 – Connection

Now the roof is connected to the rest of the home. Cabling is run, the inverter is mounted, and the system is connected to your home's electrical installation.

Mand arbejder på installation af solpaneler på tag af hvidt hus med sort tag, omringet af grøn have med blomster, planter, træer og udendørs træmøbelsæt på stenflisebelagt terrasse.

DAY 03 – Then we switch it all on

The system is tested, commissioned and walked through with you. When we leave, it shouldn't just be installed. It should be ready to work.

Solar panels

Live

Inverter

Live

Battery

Live

Home

Live

We bring the installation together

Getting solar panels should be exciting. Not a hassle.

01 – Mounting

The system is mounted correctly for your specific roof.

02 – Electrical installation

The fixed electrical connection is carried out by an authorised installer.

03 – Registration

The system is properly registered with the grid company.

04 – Handover

The system is tested, documented and walked through with you.

Aerial view of a suburban house at night with solar panels on the roof, warmly lit windows, a driveway with a parked car, a neatly maintained lawn, and surrounding trees and hedges.

So what do you actually need to do?

Not much. We plan the installation with you in advance. On the day, our installers mainly need access to the agreed areas – and we take care of the rest.

01

Before we arrive

We agree on access and placement.

02

While we work

In most cases, you can go about your day.

03

When we're done

We go through the system together.

WHAT PEOPLE OFTEN ASK US

Installation, without surprises

Do I need to be home during the installation?

You will generally need to provide access to relevant areas of your home, such as the electrical panel, utility room, or heating system. EcoRay will coordinate with you in advance if your presence is required.

What does EcoRay provide during the installation?

A complete installation should include planning, delivery, assembly, electrical work, connection, and a walkthrough of the solution. Your quote must specify what EcoRay handles and whether there is any work you need to arrange yourself.

What do I receive once the solution is operational?

You should receive a walkthrough of the system, access to relevant apps or controls, and the necessary documentation. Also, make sure you know who to contact in case of questions, errors, or a need for service.

Are the roof and electrical installation checked first?

Yes, the relevant conditions must be assessed before the installation is finalized. For solar panels, this includes the condition and load-bearing capacity of the roof; for batteries and heat pumps, it also includes placement, the electrical panel, and existing installations.

Who handles permits and registration?

Requirements depend on the solution, your home, and local conditions. EcoRay should clarify which notifications, registrations, or approvals are necessary, who handles them, and what, if anything, is your responsibility.

We don't just install solar panels

We get your home up and running

See your home's potential, the solution we recommend and what it could mean for your finances.

It only takes a few minutes

Thanks – we've got it.
Something went wrong. Try again in a moment.